Vision, method, and evidence

The factory as a learning system.

Agents connect orders, knowledge, and processes on your existing systems. They coordinate tools and complete authorized work.

Research date and latest source review: September 30, 2026

Where agents take manual work off the shop floor

  1. Access sourcesMake required data available.
  2. Build toolsDevelop connectors and deterministic checks.
  3. Verify resultsCheck independently and connect your systems.
  4. Operate workflowAssign exception responsibility.

Specialist agents and deterministic tools connect data, interfaces, and workflows. Independent verification and assigned exception handling are part of operation.

In development

Drawing data without retyping

Dimensions, tolerances, and materials are retyped by hand from drawings into routings today. Agents extract them with an evidence crop; deterministic checks flag deviations for approval.

Trialled on 11 drawing sheets, not yet in use at customers; this does not establish general accuracy.

In development

Replan supplier date changes faster

When a supplier moves a date, planning recalculates by hand today. The planning preview shows stock and capacity over six months; the planner confirms every change.

Demonstrable state with invented sample data, not yet in use at customers.

Published customer case

A documented customer entry point

At a CNC contract manufacturer, order entry fell from 20 to 2 hours weekly. The complete workflow includes ERP handoff.

The result applies to the published workflow; savings elsewhere require separate evidence.

Read the customer case →Agents and deterministic tools in the workflow →

Industrial adoption through 2031

  1. Through September 2027

    Complete work across systems

    • From isolated assistance to agents completing cross-system work.
    • Entry points: order intake, supplier exceptions, and quality documents.
    Evidence
    • 84 percent of respondents report value [E1].
    • About 20 percent of cases have scaled [E1].
    • Fraunhofer: tool orchestration [E2]; PackSys: incremental integration [E4].
    Confidence
    • Medium-high direction; lower confidence in Swiss-SME adoption speed.
    • Requires data access, responsibility, and permissions.
    Counter-signal
    • Faster extraction; exceptions consume savings.
    • Revise if manual touches/outstanding exceptions do not decrease across the workflow.
  2. October 2027 through September 2029

    Shared context and cooperating agents

    • Shared context connects orders, planning, quality, and service.
    • People direct goals/exceptions; tools and solvers compute and act.
    Evidence
    • Manufacturing-X, NIST, and ERP-agent offerings support this direction [E5, E6, E8].
    Confidence
    • Medium; requires common meanings, permissions, and cross-functional responsibility.
    • Selecting a particular model cannot replace these requirements.
    Counter-signal
    • Each new application rebuilds data foundations.
    • Reassess architecture/economics when second/third workflows reuse little context or tooling.
  3. October 2029 through September 2031

    Validated adaptation in operation

    • More factories learn from outcomes and simulate alternatives.
    • Adapt workflows/selected physical operations within agreed limits.
    Evidence
    • NIST: twin validation/uncertainty; Siemens: adaptive factories [E5, E7].
    • Announcements cannot establish universal operation.
    Confidence
    • Medium direction; low confidence in broad dependable physical autonomy.
    • Validate the process model for its specific decision.
    Counter-signal
    • Simulation and real outcomes diverge.
    • Stop mechanisms breaching quality/safety constraints; retain the connected-factory target picture.

These horizons describe adoption, organizational change, and breadth of operation. Suitable manufacturers can implement elements from any horizon today.

What the connected factory can achieve

An order ready to manufacture

IntakeDrawingsMaster dataWork instructions

Start: Verify ERP handoff, then trace requirements through to the operation.

An explainable delivery decision

MaterialSuppliersCapacityScheduling

Start: Connect a changed date to affected orders and feasible options.

Quality and expertise where needed

MeasurementsDocumentationExperience

Start: Cite certificate/answer sources; use corrections in the next workflow.

Better decisions from outcomes

EventsRulesProcess models

Start: Test scenarios; compare approved improvements against observed outcomes.

More can be built today than the catalog shows. Missing packaging requires development; assess technical feasibility separately.

CapabilityOutcome and entry pointConnection / responsibility
Order intake and documentsCapture the purchase order as a checked ERP result.Master data and exceptions; order team approves deviations.
Work instructions and MESCurrent instruction reaches the correct operation.Drawing, routing, revision; manufacturing engineering reviews.
Drawings and tolerancesIdentify conflicts before manufacturing or quoting.Evidence/dossier checks; engineering accepts critical facts.
Master data and standardsConsistent identities and units for the chosen workflow.Agents propose mappings; accountable experts confirm.
Quoting and costingReuse comparable jobs and supported costs.Routings/cost rates; estimators approve prices.
Shop floor and exceptionsResolve work arising from deviations.Deterministic metrics/tasks; shift supervisors respond.
Lead times and materialShow affected dates and unknown inputs.Check ERP durations and the reference baseline first; buyers and planners decide.
Capacity and schedulingProvide feasible date alternatives.Solver checks constraints; planner approves.
Quality and test documentsAssemble documents from real measurements.Template, lot, test data; quality signs off.
Quality analytics and causesTest hypotheses against measurements.Traceability/experiments; correlation alone cannot establish causation.
Maintenance and assetsReduce avoidable loss with useful signals.Failure history and value ceiling; asset owners respond.
Knowledge and expertiseFind cited answers and comparable cases.Sources, permissions, corrections; experts maintain accepted knowledge.
Procurement, invoices, and serviceComplete routine work through authorized transactions.Installed ERP first; approve transaction write rights separately.
Integration and orchestrationConnect systems, tools, and agents traceably.Events, permissions, evaluation; process/service responsibility.
Sovereign operationSelect suitable data and model operation.Assess data location, inference, support, license, workload TCO separately.
Digital twins and adaptationSimulate alternatives; improve using outcomes.Distinguish dashboards, process models, validated simulation, bounded control.

Availability and evidence

Documented status; each customer installation needs its own verification. Agree on the first workflow based on your operation and interfaces.

Order entry, work instructions, and shop floor
in use: Published examples/documented workflows; customer-specific integration.
Planning, lead time, orchestrator, and knowledge
in development: Further connected workflows; no single finished package yet.
Root-cause analysis and service
planned: Define outcome and initial implementation per workflow.
General operating system for an adaptive factory
not evidenced: Target picture; universal complete deployment remains unproven.

Start with one complete workflow

  1. Choose outcomeWhat should reliably get done?
  2. Assign responsibilityDefine goals, authority, and exception handling.
  3. Build connectionsResolve required sources, data, and standards within the workflow.
  4. Verify workflowMeasure output, residual work, error costs, and system effects.
  5. Next connectionReuse proven context, tools, and accepted corrections.

Sources, method, and limits

  • Observed facts, vendor assertions, and forecasts are identified separately.
  • Global surveys cannot establish representative Swiss-SME figures.
  • Deloitte counts respondents and use cases with different denominators [E1].
  • KPI potential cannot establish realized returns; Orcha-3 validates virtual chains [E2].
  • Widespread production deployment of Orcha-3 remains unproven.
  • Examples in development are labelled as such.
  • Customer results remain limited to published cases.
  • METR: perceived speed/coding experiments cannot establish universal productivity multipliers [E10].
  • Data location alone cannot establish local inference or comprehensive compliance.
  • Review support, retention, license, updates, and privacy separately.
  • AI-Act duties follow risk; industrial AI is not universally high-risk [E9].
  • No legal advice or blanket assurance for Swiss companies.
  • Boris Scharinger, Industrial AI: Pilot to Profit (2026).
  • Chapter 5: PDF pp. 115-126; chapter 9: pp. 140-150.
  • Chapter 12: pp. 161-163; chapter 20: pp. 202-226.
  • Chapter 21: pp. 227-235; chapter 24: pp. 244-272.
  • Part IV: 19 enterprise functions; taxonomy, no factorIQ benchmark.
  • Dates identify publication/update; undated pages use a September 30, 2026 retrieval date.
  • All sources were last reviewed September 30, 2026.
  • Company-wide data cleansing can follow the first selected workflow.
  • Goals, everyday responsibility, and real-workflow evidence determine the entry point.
  • New manuscripts remain under editorial review; only published articles are linked.